100Kw 3 Phase High Quality 50Kw Complete 30Kw Hybrid Solar System With Lithium Battery
-
Solar Panel Type
Monocrystalline Silicon, Polycrystalline Silicon -
Battery Type
Lead-Acid -
Controller Type
MPPT -
Mounting Type
Ground Mounting -
Load Power (W)
80KW, 100KW -
Output Voltage (V)
380V/400V -
Output Frequency
50hz/60hz -
Work Time (h)
24 hours
Produt Details
Hybrid Solar System combines advantages of on grid solar system and off grid solar system
tem | Model | Description | 30KW | 50KW | 100kW |
1 | Solar Panel | Mono Perc 455W Solar Panel | 68pcs | 119pcs | 238pcs |
2 | Combiner Box | Customized | 1 pc | 1 pc | 1 pc |
3 | Lithium Battery or Lead Acid Battery | lithium battery racks, BMS and battery cables | 1 set 30kwh 307.2V 105AH | 1set 53.76kwh 512V 105AH | 1 set104.96kwh 512V 205AH |
4 | Hybrid Inverter | 230/380VAC 50HZ built in MPPT controller | 1 pc 30KW grid hybrid | 50KW grid hybrid inverter | 1 pc 100KW grid hybrid inverter |
5 | Mounting Support | Roof/Ground | 1 set | 1 set | 1 set |
6 | Cable | 4mm² PV cable | 500m | 700m | 1200m |
7 | Connector | Solar Connector | 36pairs | 54pairs | 70pairs |
8 | Tools Bag | Solar Installation tools | 1 set | 1 set | 1 set |
What is the difference between on-grid and off-grid?
On-Grid Systems tie directly to your utility grid, selling an alternative source of energy in addition to what your utility company provides.Off-grid systems do not tie to the utility grid and are sustained using a battery bank. The battery bank can be hooked up to an inverter, which converts DC voltage to AC voltage allowing you to use any AC appliances or electronics.
How long will PV modules last?
Namkoo Solar Panels have a performance warranty of 25 years. After 5 years they should output more than 95% of the rated power, after 10 years it is 90% and 25 years it is 80%.
Will panels still charge on cloudy days?
This will also depend on the conditions. If it is cloudy and overcast, likely not. If it is cloudy and bright still, then it probably will charge but it won’t be very much.
Will my system still generate power during a blackout?
For an off-grid system, the solar panels with continue to generate power as long as the sun is still out
How much maintenance is required?
We recommend cleaning the solar panels on a weekly or bi-weekly basis in order to keep their performance high.
What voltage are your panels? Will they work with my 12V, 24V or 48V system?
We have nominal 12V and 24V panels. These panels actually produce 20+V and 30+V, respectively. Whether it will work with a 12V, 24V, and 48V will depend on the controller that you use. All the controllers we offer will work with 12/24V systems.
3 phase inverter feature:
General feature
1. Three phase line interactive inverter UPS
2. Low frequency transformer, pure sine wave output, strong load capacity
3. Intelligent LCD display
4. UPS function
5. Self protection against under voltage, over voltage, overload, short circuit and high temperature
Exclusive feature:
1. Low DC voltage, relieving battery cost
2. 100% unblance load design
3. Mains first/ battery first working mode (optional)
Solar System Application:
Inquiry Us For Discount
You May Also Like
Product Categories
Solar System
Solar Panel
- ● Mono Solar Panel
- ● Bifacial Solar Panel
- ● Poly Solar Panel
- ● All Black Solar Panel
- ● Shingled & HJT Solar Panel
- ● Flexible Solar Panel
Solar Inverter & Battery
- ● Off Grid Inverter
- ● On Grid Inverter
- ● Hybrid Inverter
- ● Lithium Battery
- ● Gel Battery
- ● AGM Battery
Solar Pump
Solar Products
- ● Solar Optimizer
- ● MPPT Controller
- ● PWM Controller
- ● Roof Bracket Mounting Structure
- ● Grounding Bracket Mounting Structure
- ● Combiner Box
Solar Application